HYDRO POWER PLANTS

As built design for HPP Sv. Petka: Electrical design-Electromechanical part, Generators voltage equipment (GVE), Auxiliary supply; Earthing and lightning installations
Ordered by KORONA engineering
2012

Main design for HPP Sv. Petka: Earthing and lightning installations, Generators voltage equipment (GVE), AC-DC supply
Ordered by KORONA engineering
2012

Design and supervision for the rehabilitation of HPP Tikves and HPP Spilje, Lot 4: Cabling
Ordered by BIS engineering and Westinghouse International Process Co.
2004

Reconstruction of busbars in HPP "Tikves", HPP "Spilje" and HPP "Globocica"
Ordered by BIS engineering
2004

Rehabilitation of 4 Hydropower Plants: "Vrutok", "Spilje", "Globocica" and "Tikves", Lot 5: rehabilitation of 220, 110 and 35 kV switchyards
Ordered by BIS engineering
2004