TRANSFORMER STATIONS

As built Design for SS 35/20(10)kV "Zabeni"
Part 1: Electromechanical design,
Part 2: Grounding, lightning protection and outdoor lighting,
Ordered by EVN Macedonia
2012

As built Design for new 110kV bay in SS 110/35/20(10) kV "Prizreni 1"
Part 1: Electromechanical design,
Part 2: Schematic and wiring diagrams and cable lists
Ordered by DASS engineering-Ohrid
2012

Main Design for reconstruction of SS 35/10kV "Kisela Voda"
Ordered by EVN Macedonia
2012

Main Design for SS 110/10 kV "Bitola 3"-110kV Line bays =A1 and =A4
Schematic and wiring diagrams and cable lists
Ordered by Energomontaza-Belgrade
2011-2012

Main Design for SS 110/10 kV "Bitola 4"-110kV Line bays =A3 and =A4
Schematic and wiring diagrams and cable lists
Ordered by Energomontaza-Belgrade
2011-2012

Detail Design for construction of new TS 132/33 kV Obudu, Nigeria
Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
2011-2012

Revision of Main design for command control building (CCB) in SS Berovo
Ordered by TSO MEPSO
2012

Revision of Main design for command control building (CCB) in SS Struga
Ordered by TSO MEPSO
2012

Revision of Main design for command control building (CCB) in SS Valandovo
Ordered by TSO MEPSO
2012

Main Design for new 110kV bay in SS 110/35/20(10) kV "Prizreni 1"
Part 1: Electromechanical design,
Part 2: Schematic and wiring diagrams and cable lists
Ordered by DASS engineering-Ohrid
2011

Detail Design for construction of new TS 132/33 kV New Abeokuta, Nigeria
Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
2010-2012

Detail Design for extension of TS 132/33kV Old Abeokuta, Nigeria
Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
2010-2012

Detail Design for extension of TS 132/33kV Papalanto, Nigeria
Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
2010-2012

Detail Design for extension of TS 132/33kV Otta, Nigeria
Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
2010-2012

Main Design for SS 400/110kV "Bitola 2"-110kV Line bay (A8) for connection to
SS "Bitola 4"
Ordered by TO MEPSO
2010

Main Design for SS 110/10kV "Bitola 3"-110kV Line bay for connection to
SS "Bitola 4"
Ordered by TO MEPSO
2010

Main Design for SS 110/10kV "Bitola 4"-Two 110kV Line bays for connection to
SS "Bitola 2" and SS "Bitola 3"
Ordered by TO MEPSO
2010

Main Design for SS 110/35kV "Jegunovce" - Line bay for connection to
SS "Skopje 1"
Ordered by TO MEPSO
2010

Main Design for replacement of 110kV busbars in SS 110/35kV "Jegunovce"
Ordered by TO MEPSO
2010

Conceptual, Basic & Detail Design for SS 35/(20)10kV "Zabeni"
Ordered by EVN Macedonia
2010

As built Design for SS 35/0,4 kV "Sokomak"
Ordered by Trimo – Slovenia, subsidiary Skopje
2010

Detail design for replacement of 400kV circuit breakers in: SS 400/110kV "Dubrovo"; SS 400/110kV "Skopje 4"; SS 400/110kV "Bitola 1"
In cooperation with ABB-Zagreb
2010

Detail design for replacement of 400kV protection in: SS 400/110kV "Dubrovo" and
SS 400/110kV "Skopje 4";
In cooperation with ABB-Zagreb
2010

Basic, Detail & As built design for SS 110/35 kV "Ferizaj 1"
Ordered by AC-DC Kosova for KOSST-Kosova
2009-2010

As built design for 110kV cable connection with 110kV line bay in SS 110/35kV "Kosovo A"
Ordered by Dass engineering - Ohrid
2009

Detail design for 110kV GIS - Switchgear "Combined heat & power plant TE-TO" Skopje
In cooperation with ABB-Zagreb
2009

Basic and Detail design for SS 110/35/10(20) kV; 2x60MVA "Vaganica"
Ordered by AC-DC Kosova for KEK-Kosova
2009

Revision of Main design for SS 10(20)/0,4kV; 1x630(1000)kVA , adapted, in business object Tineks
Ordered by Tineks
2009

Revision of Main design for SS 10(20)/0,4kV "Kliment Ohridski" Strumica
Ordered by EVN Macedonia
2009

Detail design for SS 35/6 kV; "HADE JUG"
Ordered by AC-DC Kosova
2008

Basic and Detail design for SS110/20/10 kV "Gevgelija " – grounding of neutral point on 20 kV
Ordered by ADC-Skopje
2008

Revision of Detail design for SS 400/110kV "Stip"
Ordered by TSO MEPSO
2007-2008

Design for a new 400kV bay in SS 400/110kV "Dubrovo"
In cooperation with SIEMENS A.E.
2007

Design for a new 400 kV bay in SS 400/110kV "Bitola 2"
In cooperation with DALEKOVOD-Zagreb
2007

As-built documentation for SS 6/0.48 kV, 2 x 1200kVA "Mittal", Skopje
Ordered by ABB-Skopje
2006

Design for the installation of 46 capacitor banks (10-20 kV, 600-2400 kVAr) in ESM-EVN Macedonia
Ordered by ESM, Swiss donation
2006

Design and supervision for the installation of new 110/35/10kV transformer, 31,5MVA in SS 110/35/10kV "Negotino"
Ordered by ESM
2006

Design and supervision for the installation of a new transformer 31,5MVA in SS 110/10 kV "Ohrid 2"
Ordered by ESM
2006

Detail Design for SS 35/10kV "Sveta Petka"
Ordered by EMO-Ohrid
2006

Detail Design for SS 20(10)/0.4kV (2 x 1000kVA) "Konti Hidroplast-Gevgelija"
Ordered by Konti Hidroplast-Gevgelija
2005

Design and supervision for replacement of protection and DC in SS 110/35/10kV "Kocani"
Ordered by ESM
2005

Detail Design for SS 35/10kV "Vranestica" in Kicevo
Ordered by ESM
2005


Detail Design for replacement of protection equipment in SS 110/35/10kV "Kicevo"
Ordered by ESM
2004

Detail Design for replacement of condenser batteries in SS 110/20/10kV 'Tetovo-1" (10 and 20 kV side), in SS "Gostivar" (20 kV side) and in SS "Debar 1" (10 kV side)
Ordered by ESM, Norwegian donation
2004

Detail Design for replacement of protection equipment in SS 150/110/35kV "Bitola1"
Ordered by ESM
2004

Detail Design for 110kV line bay at HPP "Kozjak"
Ordered by ESM
2003

Detail Design for "Dojran Lake Revitalisation System": SS 35/10kV "Gavato";
SS 10/0.4kV, 2 x 1600kVA "Prepumpna"; 5 x TS 10/0.4kV
Ordered by the Ministry of environment and physical planning
2002

Design for replacement of 22 circuit breakers in SS "Skopje 1"
Ordered by ESM
2002

Detail Design for new line bay in SS 400/110kV "Dubrovo"
Ordered by ESM
2001

Detail Design for SS 400/110kV "Skopje 5"
Ordered by ESM
2001

Design and supervision for a new 20MVA transformer at SS 110/35/10kV "Sopotnica"
Ordered by ESM
2000

Design and supervision for a new 40 MVA transformer at SS 110/35/10kV "Struga"
Ordered by ESM
2000 Design, revision and supervision of number of 10/0,4 kV substations