TRANSMISSION LINES

Main design for 400kV OHTL SS Bitola 2 – SS Ohrid – Macedonian/Albanian border
Ordered by: Fichner/ GEING Krebs und Kiefer International - Skopje
2017
 
Main design for 2x110kV OHTL for connection of SS in WP Bogoslovec
Ordered by: THOR impex Skopje
2017
 
Main design for 110kV OHTL Berivojica – Kitka, R. Kosovo
Ordered by: Elektra Kosovo
2017
 
Main design for relocation of existing 35kV TL Kalimanci – Mine Sasa from tower no.67 to tower no. 72
Ordered by: SHPP Ehloec
2017
 
Main design for 20(10)kV TL for connection of SHPP Ehloec to existing 20(10)kV TL.
Ordered by: SHPP Ehloec
2017
 
Main design for relocation of section of 2х110kV OHTL SS Skopje 1 - SS Gazi Baba and OHTL SS Skopje 1 – SS Vasil Glavinov
Ordered by: EVN Macedonia
2016
 
Main design for relocation of section of 35kV OHTL SS Skopje 1 – SS Centralna
Ordered by: EVN Macedonia
2016
 
Main design for relocation of section of 35kV OHTL SS Skopje 1 – SS Bit Pazar
Ordered by: EVN Macedonia                        
2016
 
Main design for construction of 20kV cable line SS 35/10(20)kV Demir Kapija – SS 10(20)/0,4kV Tunnel Т1 Local control station
Ordered by: Public enterprise for state roads Skopje
2016
 
Main design for construction of 20kV combined cable and OH line from SS 35/10(20)kV Udovo to junction point at km 15+680 for SS 10(20)/0,4kV Tunnel Т1 North
Ordered by: Public enterprise for state roads Skopje
 2016
 
Main design for relocation of section of 400kV OHTL „SS Dubrovo – Macedonian/Greek border“ from tower no.90 to tower no.94 due to crossing with new motorway А1 “Demir Kapija – Smokvica” at km.22+850
Investor: Public enterprise for state roads Skopje
Ordered by: Aktor ADT Greece – Subsidiary Skopje
2015 
 
Technical documentation for recovery of fallen tower no.16 in river Vardar from 2x35kV OHTL (input-output) in SS 35/10kV Gavato
Ordered by: EVN Macedonia                        
2015
 
Technical documentation for Reconstruction of existing OHTL 35kV SS 110/35/10kV „Ohrid 1“- SS 35/10kV „Kosel“ from tower no.2 to tower no.43
Ordered by: EVN Macedonia                        
2015
 
Technical documentation for recovery of 35kV OHTL Globochica – SY Tower Lukovo
Ordered by: EVN Macedonia                        
2015
 
Main design for construction of 2х35kV cable line SS 110/35/10kV “Bitola 3” – SS 35/10kV “Termo”
Ordered by: EVN Macedonia                        
2015
 
Main design for construction of 35kV cable line for auxiliary supply of SS 400/110kV “Dubrovo”
Ordered by: EVN Macedonia                        
2015
 
Main design for cabling of part of OHTL 35kV SS 35/10 kV “Termo” – SS 35/10 kV “West”
Ordered by: EVN Macedonia                        
2015
 
Main design for construction of 35kV OHTL for supply of SS 35/0,4kV “Stonepit”
Investor: MIS VATO DOOEL Skopje
Ordered by: ELTEK DOO - Skopje
2015
 
Main design for construction of 35kV cable line SS 110/35/10kV Kicevo - SS 35/10kV Izvor
Ordered by: EVN Macedonia                        
2015
 
Technical documentation for Recovery of fallen and damaged towers from OHTL 35kV SS 35/10kV Debar 2 – village Gorenci - SS 35/10kV Janche
(towers no. 8, 9, 10, 52 and 53)
Ordered by: EVN Macedonia                        
2015
 
Technical documentation for Recovery of fallen and damaged towers from OHTL 2x35kV village Gorenci - SS 35/10kV Centar Zupa
(towers no. 1, 2, 3, 4 and 5)
Ordered by: EVN Macedonia                        
2015
                      
Technical documentation for Recovery of fallen and damaged towers from OHTL SS 35/10kV Labunishta – SY Tower Lukovo
(towers no. 32 and 33)
Ordered by: EVN Macedonia                        
2015
 
Main design for relocation of existing 35kV OHTL HPP Kalimanci – Main Sasa from tower no. 6 to tower no. 72
Investor: Main “SASA”, М. Kamenica
Ordered by: ADC – Skopje
2015
 
Main design for 10(20)kV OHTL for connection of SHPP “125” to TSS 10(20)/0,4kV “village Lipkovo”
Ordered by: SOL Hydropower Skopje
2014
 
Preliminary design for construction of 2x35kV cable line for connection of SS 110/35/10kV “Bitola 3” – SS 35/10kV “Termo”
Ordered by: EVN Macedonia                        
2014
 
Main design for 35kV cable line for connection of HPP “Selecka river”
Ordered by: EVN Macedonia                        
2014
 
Main design for relocation-cabling of part of existing 35kV OHTL “SS Shtip 1-SS Ovche Pole” (the part from the new economy zone in Shtip to SS 110/35kV Shtip 1)
Ordered by: EVN Macedonia                        
2014
 
Preliminary design for construction of 110kV OHTL “SS 110/35/10kV Kichevo – SS 35/10kV Izvor” (replacement of existing 110kV OHTL “SS 110/35/10kV Kichevo – SS 35/10kV Izvor” due to construction of motorway А2 – section Kichevo - Trebenishta)
Ordered by: EVN Macedonia                        
2014
 
Main design for 10(20)kV OHTL for connection of SHPP “116”
Ordered by: TD “HYDROINVEST” DOO
2014
 
Main design for recovery of safety distances of conductors from ground between towers no.11 and tower no.12 from 35kV OHTL “SS Ohrid 1- SS Kosel”
Ordered by: EVN Macedonia                        
2014
 
Main design for 20kV cable line for connection of SHPP “97”, SHPP “98” and SHPP “99” to SS 110/10(20)kV “Tearce”
Ordered by: SOL Hydropower Skopje
2014
 
Main design for Reconstruction of 110kV OHTL no. 105/1 SS “Veles” - SS “Ovche Pole”
Ordered by: AD MEPSO
2013
 
Main design for Reconstruction of 110kV OHTL no. 105/2 SS “Ovche Pole” - SS “Shtip”
Ordered by: AD MEPSO
2013
 
Main design for Reconstruction of 110kV OHTL no. 116 SS “Shtip” - SS “Probishtip”
Ordered by: AD MEPSO
2013
 
Main design for Reconstruction of 110kV OHTL no. 101/2 SS “Skopje 4” - SS “Veles”
(section from Jurumleri tower no. 23 – SS “Petrovec”)
(section SS “Petrovec” - SS “Veles”)
Ordered by: AD MEPSO
2013