Превод МК Detailed Design for construction of Wind Park Budakovo (50 MW)
SS 35/110 kV WP Budakovo
2×110 kV OHL WP Budakovo – 110 kV OHL Theranda – Ferizaj (in-out)
35 kV internal MV and FOC network
Electromechanical design
Construction-civil design
Ordered by: KOSTT/Elektra Kosovo
2021 – Under progress
Main Design for construction of Wind Park WP Euroing (30 MW)
SS 33/110 kV WP Euroing
2×110 kV OHL WP Euroing – SS Gevgelija
33 kV internal MV and FOC network
Internal roads
Electromechanical design
Construction-civil design
Ordered by: Euroing Gevgelija
2019
Main Design for construction of WP Demir Kapija (Dren) (34 MW)
SS 33/110 kV WP Demir Kapija
110 kV OHL WP Dren – SS Dubrovo
33 kV internal MV and FOC network
110 kV OHL bay in SS Dubrovo
Internal roads
Electromechanical design
Construction-civil design
Ordered by: Kaltun Energy Turkey
2019-2020
Detailed Design for construction of SS 33/110kV WP Bogoslovec
Electromechanical design – Wiring diagrams
Construction-civil design
Ordered by: Hitachi ABB Croatia
2020-2021
Main Design for construction of WP Bogoslovec (36 MW)
SS 33/110 kV WP Bogoslovec
2×110 kV OHL WP Bogosovec – 110 kV OHL Stip – Ovce Pole (in-out)
33 kV internal MV and FOC network
Internal roads
Electromechanical design
Construction-civil design
Ordered by: THOR Impeks Skopje
2016-2018