Home
Company profile
References
Contact
Revision of project documentation for Substations
Revision of Main design for SS 10/110 kV IGM Trade
Investor: IGM Trade
Ordered by: Sinvir Project
Year: 2020
Revision of Detailed design for reconstruction of SS 110/35/10 kV Prilep 2 with a temporary supply solution
Investor: EVN Macedonia
Ordered by: Timel Proekt Skopje
Year: 2020
Revision of Detailed design for reconstruction of SS 110/35/10 kV Negotino with a temporary supply solution
Investor: EVN Macedonia
Ordered by: Timel Proekt Skopje
Year: 2020
Revision of Detailed design for reconstruction of SS 110/35/10 (20) kV Kavadarci 2 – Gradska with a temporary supply solution
Investor: EVN Macedonia
Ordered by: Timel Proekt Skopje
Year: 2020
Revision of Main design for Reconstruction with temporary solution for supply of SS 110/35/10kV Gazi Baba
Investor: EVN Macedonia
Ordered by: TIMEL project Skopje
Year: 2018
Revision of Main design for Reconstruction with temporary solution for supply of SS 110/10kV “Istok”
Investor: EVN Macedonia
Ordered by: TIMEL project Skopje
Year: 2018
Revision of Main design for Reconstruction with construction of new busbar system in SS 110/35/10kV Jug nova
Investor: EVN Macedonia
Ordered by: TIMEL project Skopje
Year: 2018
Revision of Main design for SS 110/20(10)kV “Neokazi” and 10(20)kV switchyard
Ordered by: VAKO Skopje, AD MEPSO – Skopje
Year: 2016
Revision of Main design for extension of SS 110/10kV “Vasil Glavinov” with one 110kV OHTL bay
Electromechanical design
Construction-civil design
Ordered by: EVN Macedonia/GEING Krebs und Kiefer International – Skopje
Year: 2015
Revision of Main design for extension of SS 110/10kV “Aerodrom” with new 110kV transformer bay and new 10(20)kV switchyard
Ordered by: EVN Macedonia/Timel proekt Skopje
Year: 2014
Revision of Main design for command control building (CCB) in SS Berovo
Ordered by AD MEPSO
Year: 2012
Revision of Main design for command control building (CCB) in SS Struga
Ordered by AD MEPSO
Year: 2012
Revision of Main design for command control building (CCB) in SS Valandovo
Ordered by AD MEPSO
Year: 2012
Revision of design documentation for adaptation and reconstruction of on-duty department and operating rooms
Ordered by PHI City general hospital “8
th
September”-Skopje
Year: 2011
Revision of design documentation for adaptation and reconstruction of haemodialysis centre
Ordered by PHI City general hospital “8
th
September”-Skopje
Year: 2011
Revision of Main design for SS 10(20)/0,4kV; 1×630(1000)kVA , adapted, in business object Tineks
Ordered by Tineks
Year: 2009
Revision of Main design for SS 10(20)/0,4kV “Kliment Ohridski” Strumica
Ordered by EVN Macedonia
Year: 2009
Revision of Detail design for SS 400/110kV “Stip”
Ordered by AD MEPSO
Year: 2007-2008