Revision of project documentation for Substations

  • Revision of Main design for SS 10/110 kV IGM Trade
    • Investor: IGM Trade
    • Ordered by: Sinvir Project
    • Year: 2020
  • Revision of Detailed design for reconstruction of SS 110/35/10 kV Prilep 2 with a temporary supply solution
    • Investor: EVN Macedonia
    • Ordered by: Timel Proekt Skopje
    • Year: 2020
  • Revision of Detailed design for reconstruction of SS 110/35/10 kV Negotino with a temporary supply solution
    • Investor: EVN Macedonia
    • Ordered by: Timel Proekt Skopje
    • Year: 2020
  • Revision of Detailed design for reconstruction of SS 110/35/10 (20) kV Kavadarci 2 – Gradska with a temporary supply solution
    • Investor: EVN Macedonia
    • Ordered by: Timel Proekt Skopje
    • Year: 2020
  • Revision of Main design for Reconstruction with temporary solution for supply of SS 110/35/10kV Gazi Baba
    • Investor: EVN Macedonia
    • Ordered by: TIMEL project Skopje
    • Year: 2018
  • Revision of Main design for Reconstruction with temporary solution for supply of SS 110/10kV “Istok”
    • Investor: EVN Macedonia
    • Ordered by: TIMEL project Skopje
    • Year: 2018
  • Revision of Main design for Reconstruction with construction of new busbar system in SS 110/35/10kV Jug nova
    • Investor: EVN Macedonia
    • Ordered by: TIMEL project Skopje
    • Year: 2018
  • Revision of Main design for SS 110/20(10)kV “Neokazi” and 10(20)kV switchyard
    • Ordered by: VAKO Skopje, AD MEPSO – Skopje
    • Year: 2016
  • Revision of Main design for extension of SS 110/10kV “Vasil Glavinov” with one 110kV OHTL bay
    • Electromechanical design
    • Construction-civil design
    • Ordered by: EVN Macedonia/GEING Krebs und Kiefer International – Skopje
    • Year: 2015
  • Revision of Main design for extension of SS 110/10kV “Aerodrom” with new 110kV transformer bay and new 10(20)kV switchyard
    • Ordered by: EVN Macedonia/Timel proekt Skopje
    • Year: 2014
  • Revision of Main design for command control building (CCB) in SS Berovo
    • Ordered by AD MEPSO
    • Year: 2012
  • Revision of Main design for command control building (CCB) in SS Struga
    • Ordered by AD MEPSO
    • Year: 2012
  • Revision of Main design for command control building (CCB) in SS Valandovo
    • Ordered by AD MEPSO
    • Year: 2012
  • Revision of design documentation for adaptation and reconstruction of on-duty department and operating rooms
    • Ordered by PHI City general hospital “8th September”-Skopje
    • Year: 2011
  • Revision of design documentation for adaptation and reconstruction of haemodialysis centre
    • Ordered by PHI City general hospital “8th September”-Skopje
    • Year: 2011
  • Revision of Main design for SS 10(20)/0,4kV; 1×630(1000)kVA , adapted, in business object Tineks
    • Ordered by Tineks
    • Year: 2009
  • Revision of Main design for SS 10(20)/0,4kV “Kliment Ohridski” Strumica
    • Ordered by EVN Macedonia
    • Year: 2009
  • Revision of Detail design for SS 400/110kV “Stip”
    • Ordered by AD MEPSO
    • Year: 2007-2008