Substations

  • Main design for SS 20/110kV PVPP Gneotino
    • Electromechanical design
    • Grounding system and lightning protection
    • Investor/Ordered by: Fortis Energy & construction
    • Year: 2022
  • Main design for SS 20/110kV PVPP Probishtip
    • Electromechanical design
    • Grounding system and lightning protection
    • Ordered by: MMA Energy
    • Investor: Baka Energy
    • Year: 2022
  • Main design for SS 20/110kV PVPP Chashica
    • Electromechanical design
    • Grounding system and lightning protection
    • Ordered by: MMA Energy
    • Investor: Baka Energy
    • Year: 2022
  • Main design for SS 20/110kV PVPP Armatush
    • Electromechanical design
    • Grounding system and lightning protection
    • Ordered by: MMA Energy
    • Investor: Italian Solar Energy
    • Year: 2022
  • Main design for SS 20/110kV PVPP Oslomej 3-b
    • Electromechanical design
    • Grounding system and lightning protection
    • Investor/Ordered by: Fortis Energy & construction
    • Year: 2021-2022
  • Main design for SS 33/110kV WP Budakova (Kosovo)
    • Electromechanical design
    • Grounding system and lightning protection
    • Beneficiary: KOSTT
    • Investor: BONDCOM ENERGY POINT L.L.C Kosovo
    • Ordered by: Electra energy
    • Year: 2021
  • Detail design for SS 33/110kV WP Bogoslovec
    • Electromechanical design
    • Grounding system and lightning protection
    • Investor: THOR impeks Skopje
    • Ordered by: Hitachi ABB Croatia
    • Year: 2020-2021
  • Main design for SS 33/110kV WP Demir Kapija (Dren)
    • Electromechanical design
    • Grounding system and lightning protection
    • Investor/ Ordered by: Kaltun energy
    • Year: 2019-2020
  • Main design for SS 33/110kV WP Euroing
    • Electromechanical design
    • Grounding system and lightning protection
    • Investor/ Ordered by: Euroing Gevgelija
    • Year: 2019
  • Main design for SS 33/110kV WP Bogoslovec
    • Electromechanical design
    • Grounding system and lightning protection
    • Investor/Ordered by: THOR impeks Skopje
    • Year: 2017-2019
  • Main design and As built design for replacement of primary equipment in SS 110/35/10kV Valandovo
    • Electromechanical design
    • Beneficiary: AD MEPSO
    • Ordered by: Benning Psam DOO Skopje
    • Year: 2019-2020
  • Main design and As built Design for temporary supply of SS 110/10kV “Aerodrom” and construction of new OHTL portals and new bus bars
    • Electromechanical design
    • Investor/Ordered by: EVN Macedonia
    • Year: 2017-2018
  • Main Design and As built design for extension of SS 35/(20)10kV “Bukri” with one transformer bay and new 20kV switchyard
    • Electromechanical design
    • Construction-civil design
    • Schematic and wiring diagrams
    • Ordered by: EVN Macedonia
    • Year: 2016-2017
  • Main design for 400/110 kV SS Ohrid and access road
    • Electromechanical design
    • Construction-civil design
    • Ordered by: AD MEPSO
    • Year: 2016
  • Main design for 400 kV bay in SS 400/110 kV Bitola 2
    • Electromechanical design
    • Construction-civil design
    • Ordered by: AD MEPSO
    • Year: 2016
  • Main design for transformer foundation, cable supports, laying of power and signal cables in trench, oil separation system in SS 35(20)/10kV Pesochan
    • Ordered by: EVN Macedonia
    • Year: 2015
  • Main design for construction of third 110kV transformer bay and 20kV cubicles in existing SS 110/35/10kV “Zapad”
    • Electromechanical design
    • Construction-civil design
    • Ordered by: EVN Macedonia
    • Year: 2014
  • Main design for extension of SS 400/110/20kV “Zemblak” in R. Albania
    • Construction-civil design:
    • Foundation for 400/110kV transformer,
    • Supports for equipment 400kV and 110kV
    • Portals 400kV and 110kV
    • Bus bars 400kV and 110kV
    • Investor: OST Albania
    • Ordered by: Konchar KET – Zagreb
    • Year: 2013-2014
  • Detailed design and As built design for construction of one 110kV OHTL bay and new command control building in existing SS 110/35/10kV “Valandovo”
    • Electromechanical design
    • Investor: ELEM
    • Ordered by: DASS engineering Ohrid
    • Year: 2013-2014
  • Design for operation and maintenance for SS 110/10kV “Bitola 3”
    • Ordered by: Energomontaza – Belgrade
    • Year: 2014
  • Design for operation and maintenance for SS 110/10kV “Bitola 4”
    • Ordered by: Energomontaza – Belgrade
    • Year: 2014
  • As built design for SS 110/10kV “Bitola 3”
    • Electromechanical design
    • 110kV OHTL bays =A1 and =A4: Schematic and wiring diagrams and cable lists
    • Civil-construction design
    • Ordered by: Energomontaza – Belgarde
    • Year: 2014
  • As built design for SS 110/10kV “Bitola 4”
    • Electromechanical design
    • 110kV OHTL bays =A3 and =A4: Schematic and wiring diagrams and cable lists
    • Civil-construction design
    • Ordered by: Energomontaza – Belgarde
    • Year: 2014
  • Preliminary design for WPP “Vardar project”
    • 110 kV connecting TLs
    • SS 10(20)/110kV
    • Ordered by: Nesa energy DOO Strumica
    • Year: 2013
  • Main design for construction of third 110kV transformer bay and 20kV cubicles in existing SS 110/35/10kV “Zapad”
    • Electromechanical design
    • Investor/Ordered by: EVN Macedonia
    • Year: 2013
  • ·  As built Design for SS 35/20(10)kV “Zabeni”
    • Part 1: Electromechanical design,
    • Part 2: Grounding, lightning protection and outdoor lighting,
    • Ordered by EVN Macedonia
    • Year: 2012
  • As built Design for new 110kV bay in SS 110/35/20(10) kV “Prizreni 1”
    • Part 1: Electromechanical design,
    • Part 2: Schematic and wiring diagrams and cable lists
    • Ordered by DASS engineering-Ohrid
    • Year: 2012
  • Main Design for reconstruction of SS 35/10kV “Kisela Voda”
    • Ordered by EVN Macedonia
    • Year: 2012
  • As built design for HPP Sv. Petka: Electrical design-Electromechanical part, Generators voltage equipment (GVE), Auxiliary supply; Earthing and lightning installations
    • Ordered by KORONA engineering
    • Year: 2012
  • Main design for HPP Sv. Petka: Earthing and lightning installations, Generators voltage equipment (GVE), AC-DC supply
    • Ordered by KORONA engineering
    • Year: 2012
  • Main Design for SS 110/10 kV “Bitola 3”-110kV Line bays =A1 and =A4
    • Schematic and wiring diagrams and cable lists
    • Ordered by Energomontaza-Belgrade
    • Year: 2011-2012
  • Main Design for SS 110/10 kV “Bitola 4”-110kV Line bays =A3 and =A4
    • Schematic and wiring diagrams and cable lists
    • Ordered by Energomontaza-Belgrade
    • Year: 2011-2012
  • Detail Design for construction of new TS 132/33 kV Obudu, Nigeria
    • Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
    • Year: 2011-2012
  • Main Design for new 110kV bay in SS 110/35/20(10) kV “Prizreni 1”
    • Part 1: Electromechanical design,
    • Part 2: Schematic and wiring diagrams and cable lists
    • Ordered by DASS engineering-Ohrid
    • Year: 2011
  • Detail Design for construction of new TS 132/33 kV New Abeokuta, Nigeria
    • Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
    • Year: 2010-2012
  • Detail Design for extension of TS 132/33kV Old Abeokuta, Nigeria
    • Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
    • Year: 2010-2012
  • Detail Design for extension of TS 132/33kV Papalanto, Nigeria
    • Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
    • Year: 2010-2012
  • Detail Design for extension of TS 132/33kV Otta, Nigeria
    • Ordered by Chris Ejik International Agencies Ltd, Lagos Nigeria
    • Year: 2010-2012
  • Main Design for SS 400/110kV “Bitola 2”-110kV Line bay (A8) for connection to SS “Bitola 4”
    • Ordered by AD MEPSO
    • Year: 2010
  • Main Design for SS 110/10kV “Bitola 3”-110kV Line bay for connection to SS “Bitola 4”
    • Ordered by AD MEPSO
    • Year: 2010
  • Main Design for SS 110/10kV “Bitola 4”-Two 110kV Line bays for connection to SS “Bitola 2” and SS “Bitola 3”
    • Ordered by AD MEPSO
    • Year: 2010
  • Main Design for SS 110/35kV “Jegunovce” – Line bay for connection to  SS “Skopje 1”
    • Ordered by AD MEPSO
    • Year: 2010
  • Main Design for replacement of 110kV busbars in SS 110/35kV  “Jegunovce”
    • Ordered by AD MEPSO
    • Year: 2010
  • Conceptual, Basic & Detail Design for SS 35/(20)10kV  “Zabeni”
    • Ordered by EVN Macedonia
    • Year: 2010
  • As built Design for SS 35/0,4 kV  “Sokomak”
    • Ordered by Trimo – Slovenia, subsidiary Skopje
    • Year: 2010
  • Detail design for replacement of 400 kV circuit breakers in: SS 400/110kV “Dubrovo”; SS 400/110kV “Skopje 4″; SS 400/110kV “Bitola 1”  
    • In cooperation with ABB-Zagreb
    • Year: 2010
  • Detail design for replacement of 400kV protection in: SS 400/110kV “Dubrovo” and  SS 400/110kV “Skopje 4″;
    • In cooperation with ABB-Zagreb
    • Year: 2010
  • Basic, Detail & As built design for  SS 110/35 kV “Ferizaj 1”
    • Ordered by AC-DC Kosova for KOSST-Kosova
    • Year: 2009-2010
  • As built design for 110kV cable connection with 110kV line bay in SS 110/35kV “Kosovo A”
    • Ordered by Dass engineering – Ohrid
    • Year: 2009
  • Detail design for  110kV GIS – Switchgear “Combined heat & power plant TE-TO” Skopje
    • In cooperation with ABB-Zagreb
    • Year: 2009
  • Basic and Detail design for  SS 110/35/10(20) kV; 2x60MVA “Vaganica”
    • Ordered by AC-DC Kosova for KEK-Kosova
    • Year: 2009
  • Detail design for  SS 35/6 kV; “HADE JUG”
    • Ordered by AC-DC Kosova
    • Year: 2008
  • Basic and Detail design for  SS110/20/10 kV “Gevgelija ” – grounding of neutral point on 20 kV
    • Ordered by ADC-Skopje
    • Year: 2008
  • Design for a new 400kV bay in SS 400/110kV “Dubrovo“
    • In cooperation with SIEMENS A.E.
    • Year: 2007
  • Design for a new 400 kV bay in  SS 400/110kV “Bitola 2”
    • In cooperation with DALEKOVOD-Zagreb
    • Year: 2007
  • As-built documentation for SS 6/0.48 kV, 2 x 1200kVA “Mittal”, Skopje
    • Ordered by ABB-Skopje
    • Year: 2006
  • Design for the installation of 46 capacitor banks (10-20 kV, 600-2400 kVAr) in ESM-EVN Macedonia
    • Ordered by ESM, Swiss donation
    • Year: 2006
  • Design and supervision for the installation of new 110/35/10kV transformer, 31,5MVA in SS 110/35/10kV “Negotino”
    • Ordered by ESM
    • Year: 2006
  • Design and supervision for the installation of a new transformer 31,5MVA in SS 110/10 kV “Ohrid 2”
    • Ordered by ESM
    • Year: 2006
  • Detail Design for SS 35/10kV “Sveta Petka”
    • Ordered by EMO-Ohrid
    • Year: 2006
  • ·  Detail Design for SS 20(10)/0.4kV (2 x 1000kVA) “Konti Hidroplast-Gevgelija”
    • Ordered by Konti Hidroplast-Gevgelija
    • Year: 2005
  • ·  Design and supervision for replacement of protection and DC in SS 110/35/10kV “Kocani”
    • Ordered by ESM
    • Year: 2005
  • Detail Design for SS 35/10kV “Vranestica” in Kicevo
    • Ordered by ESM
    • Year: 2005
  • Design and supervision for the rehabilitation of  HPP Tikves and HPP Spilje,
    • Lot 4: Cabling
    • Ordered by BIS engineering and Westinghouse International Process Co.
    • Year: 2004
  • Detail Design for replacement of protection equipment in SS 110/35/10kV “Kicevo”
    • Ordered by ESM
    • Year: 2004
  • Detail Design for replacement of condenser batteries in SS 110/20/10kV ‘Tetovo-1” (10 and 20 kV side), in SS “Gostivar” (20 kV side) and in SS “Debar 1” (10 kV side)
    • Ordered by ESM, Norwegian donation
    • Year: 2004
  • Reconstruction of busbars in HPP “Tikves”, HPP “Spilje” and HPP “Globocica”
    • Ordered by BIS engineering
    • Year: 2004
  • Rehabilitation of 4 Hydropower Plants: “Vrutok”, “Spilje”, “Globocica” and “Tikves”, Lot 5: rehabilitation of 220, 110 and 35 kV switchyards
    • Ordered by BIS engineering
    • Year: 2004
  • Detail Design for replacement of protection equipment in SS 150/110/35kV “Bitola1”
    • Ordered by ESM
    • Year: 2004
  • Detail Design for 110kV line bay at HPP “Kozjak”
    • Ordered by ESM
    • Year: 2003
  • Detail Design for “Dojran Lake Revitalisation System”: SS 35/10kV “Gavato”; SS 10/0.4kV, 2 x 1600kVA “Prepumpna”; 5 x TS 10/0.4kV
    • Ordered by the Ministry of environment and physical planning
    • Year: 2002
  • Design for replacement of 22 circuit breakers in SS “Skopje 1”
    • Ordered by ESM
    • Year: 2002
  • Detail Design for new line bay in SS 400/110kV “Dubrovo“
    • Ordered by ESM
    • Year: 2001
  • Detail Design for SS 400/110kV “Skopje 5“
    • Ordered by ESM
    • Year: 2001
  • Design and supervision for a new 20MVA transformer at SS 110/35/10kV “Sopotnica”
    • Ordered by ESM
    • Year: 2000
  • Design and supervision for a new 40 MVA transformer at SS 110/35/10kV “Struga”
    • Ordered by ESM
    • Year: 2000